https://defra.bravosolution.co.uk
Published
Value
Description
The Authority has procured Design, Build, Installation, Commissioning and Handover Services for works on the APHA Science Estate. This includes the estate at Weybridge, as well as the Regional Labs at Starcross, Camarthen, Penrith, Newcastle, Shrewsbury, Bury St Edmonds, Sutton Bonnington. The following organisations are able to use the framework: Animal and Plant Health Agency, Department for Environment Food Rural Affairs; Environment Agency, ; Marine Management Organisation; Natural England and Rural Payments Agency. The framework is broken down into seven (7) lots including, Works in Containment Facilities, General Accommodation works, Site Infrastructure Works, Security Systems, Biowaste Effluent Treatment System, Multiple Discipline Design Services and Professional Services. Lot 1: Works in containment facilities Full project life cycle including design, build, installation and refurbishments inside the containment laboratory environment. Projects will require a high standard of general design management including all design disciplines; due to the nature of the technical requirements they are likely to be MEP biased with supporting works such as builders work, air flow analysis and rectification, Building Management Systems (BMS), containment sealability assessment and rectification, provisions of appropriate fixtures and fittings etc. as required to support the MEP works. A key component of Lot 1 will be capability to design, install and commission containment laboratories and associated support facilities. Containment levels will vary from CL2, CL3 SAPO3 and SAPO4 and a combination thereof. Lot 2: General Accommodation Works Full project life cycle including design, build and installation works on DEFRA sites, outside containment or in buildings that do not have containment. Projects will require a high standard of general design management including all design disciplines. Projects will comprise of carrying out surveys, minor alterations, fabric repairs, redecoration, refurbishments, and new buildings in unoccupied and occupied buildings. There may also be a requirement to perform demolitions, asbestos removal, enabling works, infrastructure and building clearances under this lot. Lot 3: Infrastructure Works Full project life cycle including design, build and installation works on DEFRA sites and relate to civil engineering and infrastructure works to support building projects. Projects will require a high standard of general design management including all design disciplines. Works include new geotechnical surveys, earthworks, site preparation, water, gas, telecom, electricity utilities, other below ground services, onsite roads, pavements, hard landscaping, retaining structures, foul and storm water drainage and other associated infrastructure to support developments and are typically will include the following building types. There may also be a requirement to perform demolitions, asbestos removal, enabling works, infrastructure and building clearances under this lot. Lot 4: Security Full project life cycle for active security on sites and within buildings including laboratory / animal facilities, The design, installation & maintenance of active security systems including the following typical systems: • CCTV camera systems; • Perimeter intrusion detection systems; • Intrusion detection systems; • Visitor entry; • Access Control; • Security Lighting; • Security Fencing • Tracking systems • Control rooms. Lot 6: Multiple Discipline Design Services This lot will include the provision of multiple discipline design services for construction projects including a wide range of project types such as high containment, non-containment, refurbishment, new buildings, infrastructure, and associated works. The design disciplines include the following, however specialist design services may be requested in addition to these services: •Design Management; •Health, Safety and Environmental Design Management; •Principal Designer; •Containment / Laboratory Specialist Designer; •Security Designer; •Architecture (including Lead Designer); •Landscape Architecture; •BIM Digital Information Manager; •Building Services Engineer (including MEP); •Structural Engineering; •Civil Engineering; •Sustainability Engineer; •Acoustic Engineering. •Fire Engineering Lot 7: Professional Services The provision of Programme Management, Project Management, Design Management and Cost Management services for construction projects including a wide range of project types such as containment, non-containment, refurbishment, new buildings, infrastructure, and associated works. Lot 5: Biowaste Effluent Treatment System The full project life cycle including design, build and installation of effluent treatment systems to serve the bio-containment environment. Projects will require a high standard of design management. A key component of Lot 5 will be the capability to design, install, commission and then validate the newly installed/modified equipment. Systems are expected to treat up to CL3 and SAPO4 liquid waste and integrate with the primary containment barrier. Lot 1: Works in containment facilities Full project life cycle including design, build, installation and refurbishments inside the containment laboratory environment. Projects will require a high standard of general design management including all design disciplines; due to the nature of the technical requirements they are likely to be MEP biased with supporting works such as builders work, air flow analysis and rectification, Building Management Systems (BMS), containment sealability assessment and rectification, provisions of appropriate fixtures and fittings etc. as required to support the MEP works. A key component of Lot 1 will be capability to design, install and commission containment laboratories and associated support facilities. Containment levels will vary from CL2, CL3 SAPO3 and SAPO4 and a combination thereof. Lot 2: General Accommodation Works Full project life cycle including design, build and installation works on DEFRA sites, outside containment or in buildings that do not have containment. Projects will require a high standard of general design management including all design disciplines. Projects will comprise of carrying out surveys, minor alterations, fabric repairs, redecoration, refurbishments, and new buildings in unoccupied and occupied buildings. There may also be a requirement to perform demolitions, asbestos removal, enabling works, infrastructure and building clearances under this lot. Lot 3: Infrastructure Works Full project life cycle including design, build and installation works on DEFRA sites and relate to civil engineering and infrastructure works to support building projects. Projects will require a high standard of general design management including all design disciplines. Works include new geotechnical surveys, earthworks, site preparation, water, gas, telecom, electricity utilities, other below ground services, onsite roads, pavements, hard landscaping, retaining structures, foul and storm water drainage and other associated infrastructure to support developments and are typically will include the following building types. There may also be a requirement to perform demolitions, asbestos removal, enabling works, infrastructure and building clearances under this lot. Lot 4: Security Full project life cycle for active security on sites and within buildings including laboratory / animal facilities, The design, installation & maintenance of active security systems including the following typical systems: • CCTV camera systems; • Perimeter intrusion detection systems; • Intrusion detection systems; • Visitor entry; • Access Control; • Security Lighting; • Security Fencing • Tracking systems • Control rooms. Lot 6: Multiple Discipline Design Services This lot will include the provision of multiple discipline design services for construction projects including a wide range of project types such as high containment, non-containment, refurbishment, new buildings, infrastructure, and associated works. The design disciplines include the following, however specialist design services may be requested in addition to these services: •Design Management; •Health, Safety and Environmental Design Management; •Principal Designer; •Containment / Laboratory Specialist Designer; •Security Designer; •Architecture (including Lead Designer); •Landscape Architecture; •BIM Digital Information Manager; •Building Services Engineer (including MEP); •Structural Engineering; •Civil Engineering; •Sustainability Engineer; •Acoustic Engineering. •Fire Engineering Lot 7: Professional Services The provision of Programme Management, Project Management, Design Management and Cost Management services for construction projects including a wide range of project types such as containment, non-containment, refurbishment, new buildings, infrastructure, and associated works. Lot 5: Biowaste Effluent Treatment System The full project life cycle including design, build and installation of effluent treatment systems to serve the bio-containment environment. Projects will require a high standard of design management. A key component of Lot 5 will be the capability to design, install, commission and then validate the newly installed/modified equipment. Systems are expected to treat up to CL3 and SAPO4 liquid waste and integrate with the primary containment barrier.
Timeline
Publish date
3 years ago
Close date
2 years ago
Buyer information
Department for Environment, Food and Rural Affairs (DEFRA)
- Email:
- dawn.donaldson@defra.gov.uk
Explore contracts and tenders relating to Department for Environment, Food and Rural Affairs (DEFRA)
Go to buyer profileNotice topics
Source
"Find-a-Tender"To save this opportunity, sign up to Stotles for free.
Save in appTender tracking
Access a feed of government opportunities tailored to you, in one view. Receive email alerts and integrate with your CRM to stay up-to-date.
Proactive prospecting
Get ahead of competitors by reaching out to key decision-makers within buying organisations directly.
360° account briefings
Create in-depth briefings on buyer organisations based on their historical & upcoming procurement activity.
Collaboration tools
Streamline sales workflows with team collaboration and communication features, and integrate with your favourite sales tools.
Explore similar tenders and contracts
Browse open tenders, recent contract awards and upcoming contract expiries that match similar CPV codes.
- Openclosing
GB-London: PE0589 - Peabody Biodiversity Action Plan
Peabody Trust37,500 GBPPublished today
- Openclosing
PAN3023 - Construction of Hill View Children’s Home - Blackmore Drive Leicester LE3 1LQ
Leicester City CouncilPublished today
- Openclosing
A417 Missing Link - Surface & Ground Water Monitoring
KIER TRANSPORTATION LIMITED50,000 GBPPublished today
- Openclosing
Lake District National Park Authority (C to C National Trail Improvements- Ennerdale)
Lake District National Park75,000 GBPPublished today
Explore other contracts published by Department for Environment, Food and Rural Affairs (DEFRA)
Explore more open tenders, recent contract awards and upcoming contract expiries published by Department for Environment, Food and Rural Affairs (DEFRA).
- Unknown
Defra - Future End User Services Procurement
Department for Environment, Food and Rural Affairs (DEFRA)132,000,000 GBPPublished in 7 months
- Unknown
Equine anthelmintic resistance: Anthelmintic efficacy in Parascaris spp. (ascarids) populations in foals and youngstock and existing management strategies on UK stud farms.
Department for Environment, Food and Rural Affairs (DEFRA)Published in 12 days
- Openclosing
Provision of Asbestos Services
Department for Environment, Food and Rural Affairs (DEFRA)Published 8 days ago
- Openclosing
Particulate Matter (PM) 2.5 Site Establishment - Project Delivery
Department for Environment, Food and Rural Affairs (DEFRA)4,400,000 GBPPublished 14 days ago
- Openclosing
Particulate Matter (PM) 2.5 Site Establishment - Project Delivery
Department for Environment, Food and Rural Affairs (DEFRA)4,400,000 GBPPublished 14 days ago
- Openclosing
PM2.5 Site Establishment – Project Delivery
Environment Agency4,800,000 GBPPublished 14 days ago
- Openclosing
Supply of Gases to the Air Quality Monitoring Network
Environment Agency970,600 GBPPublished 27 days ago
- Openclosing
Updating our water benefit model (NWEBS) – phase three
Environment Agency300,000 GBPPublished 30 days ago
Explore more suppliers to Department for Environment, Food and Rural Affairs (DEFRA)
Sign upExplore top buyers for public sector contracts
Discover open tenders, contract awards and upcoming contract expiries of thousands of public sector buyers below. Gain insights into their procurement activity, historical purchasing trends and more.
Explore top sources for public sector contracts
Stotles aggregates public sector contract data from every major procurement data source. We ingest this data and surface the most relevant insights for our users. Explore our list of public sector procurement data sources below.